Eng | Рус

Design


CJSC Polymetal Engineering basing on the computer geological model of a deposit and ore processing procedure carries out elaboration of design documentation for construction of mining and processing works at all three stages of investment and construction project: pre-investment, investment and operating.

Framework for the start of operation is computer modeling of ore deposits on the basis of Datamine system which ensures efficiency and completeness of utilization of all geological information at deposit's economic-geological evaluation stages during conditions development, reserves estimate and designing of mining plants.

Acquired experience of JSC Polymetal in creation and implementation of development projects for precious metals deposits in several Russian regions using various ore processing methods allows ensuring designing on a real-time basis with prompt updating and transfer of the information to the process' participants.

 

Specialists of CJSC Polymetal Engineering have a unique experience in project development of solid minerals deposits. They have put into operation 8 plants in leading traditional gold and silver-mining regions of Russia - from Ural to Far North with severe climatic conditions. The largest of them are the Dukatand the Khakandja, the Vorontsovskoe and the Lunnoe deposits.

Specialists of CJSC Polymetal Engineering actively participate in achieving of plant's design performance during testing and commissioning and provide designer supervision for implementation of engineering and design solutions which allows realizing any investment projects within tight schedule. Eventually implementation of in-house design and innovative solutions together with strict control over capital investments results in significant reduction of production costs and production efficiency enhancement.