Eng | Рус

Reserves and Resources


Click for the audited statements of reserves and resources in accordance with JORC code

One of the Company’s development priorities is to create the optimal portfolio of assets that facilitate a highquality, long-term resource base. Polymetal uses JORC standards to assess its reserves and resources.

Audited existing reserve base will ensure ongoing profitable performance of the Company’s operating gold and silver mines for the next 10–20 years. The Dukat and Lunnoye deposits, which are silver mining units with a significant volume of gold mining as a byproduct, are located in the Magadan Region in Russia's northeast. Khakanja (Khabarovsk Territory) and Voro (Sverdlovsk Region) are gold deposits. Significant amounts of silver are also mined at Khakanja. The Company is currently building a new mine in Albazino which is scheduled to produce its first gold in 2011.

Polymetal JORC-Compliant ore reserves by mining asset (1)

Mine

Tonnage

(kt)

Au Grade

(g/t)

Contained

Au(t)

Contained

Au(moz)

Ag Grade

(g/t)

Contained Ag

(t)

Contained Ag

(moz)

Production assets

Dukat

23 835

0,9

21

0,7

405

9 656

310

Lunnoye

3 764

1,3

5

0,2

406

1 529

49

Khakanja

3 661

5,4

20

0,6

245

898

29

Voro

19 154

2,8

53

1,7

3

62

2

Varvarinskoye (2)

36 400

1,1

41

1,3

-

-

-

Subtotal

86 814

1,6

141

4,5

140

12 145

390

Development projects

Albazino (3)

17 375

4,1

71

2,3

-

-

-

Sopka Kvartsevaya (4)

1 400

12,0

17

0,5

260

360

12

Subtotal

18 775

4,7

88

2,8

19

360

12

TOTAL

105 589

2,2

229

7,3

118

12 505

402

Notes:       
(1) Unless otherwise stated, ore reserves are quoted as at January 1, 2009 in accordance with the JORC Code, confirmed by SRK Consulting (UK) Ltd. Reserves are estimated on the basis of Measured and Indicated resources (not accounting for Inferred resources). Underlying price assumptions as audited by SRK Consulting (UK) Ltd. are $600/oz for gold and $11 /oz for silver. Dukat reserves include Nachalnoye-2 satellite deposit, Lunnoye reserves include Arylakh satellite deposit, Khakanja reserves include Yurievskoye satellite deposit.  
(2)  Estimated by Orsu Metals Corporation as at 01.01.2009 in accordance with the JORC code       
(3) Comfirmed by Snowden Mining Industry Consultants Inc. in acordance with the JORC Code in July 2009      
(4) Estimated by AMC Consultants in accordance with the JORC Code in 2007

An external audit confirmed Polymetal mineral resources and ore reserves as at December, 31 2008 in accordance with the JORC Code. Gold reserves grew by 47% (1.7 Moz), primarily due to Albazino, which was added to Polymetal’s reserve portfolio in 2008. The Company’s independently audited gold resources grew by 21% (1.4 Moz) as a result of exploration and a re-evaluation of economic conditions in 2008. The growth stemmed primarily from the Birkachan and Oroch deposits, where the Company has been actively developing its resource base in anticipation of the planned commissioning of Kubaka in 2010.

By 2011, the Company aims to increase its gold resources to 12 Moz and its silver resources to 800 Moz as a result of in-house exploration and acquiring new assets. It also seeks to increase its gold reserves to 8 Moz and silver reserves to 600 Moz.

Mineral Resources Statement, as of January 1, 2009 (1)

Mine

Tonnage

(kt)

Au Grade

(g/t)

Contained

Au(t)

Contained

Au(moz)

Ag Grade

(g/t)

Contained

Ag(t)

Contained

Ag(moz)

Production assets

Dukat

19 952

1,1

22

0,7

534

10 652

342

Lunnoye

8 997

1,2

11

0,4

349

3 143

101

Khakanja

5 026

5,1

26

0,8

219

1 100

35

Voro

22 751

2,8

63

2,0

4

92

3

Varvarinskoye (2)

92 200

1,0

97

3,1

-

-

-

Subtotal

148 926

1,5

218

7,0

101

14 987

482

Development projects

Albazino (3)

21 306

4,3

92

2,9

-

-

-

Goltsovoye (4)

2 397

-

-

-

895

2 146

69

Sopka Kvartsevaya (5)

13 400

2,3

31

1,0

63

842

27

Maiskoye (6)

19 796

11,8

233

7,5

-

-

-

Perevalnoye

1 174

-

-

-

364

427

14

Galkinskoye

14 237

1,3

18

0,6

34

480

15

Birkachan & Oroch

19 434

2,5

49

1,6

27

528

17

Tsokol (7) 1 300 8,1 10 0,3 13 17 0,5

Subtotal

93 044

4,7

433

13,9

48

4 440

143

TOTAL

241970

2,7

651

20,9

80

19 427

625

Notes:
(1) Unless otherwise stated, mineral resources are quoted as at January 1, 2009 in accordance with the JORC Code, confirmed by SRK Consulting (UK) Ltd.
Measured and Indicated resources are included to the Ore Reserves.
Underlying price assumptions as audited by SRK Consulting (UK) Ltd. are $700/oz for gold and $13.5 /oz for silver.
Dukat reserves include Nachalnoye-2 satellite deposit, Lunnoye reserves include Arylakh satellite deposit, Khakanja reserves include Yurievskoye satellite deposit.
(2)  Estimated by Orsu Metals Corporation as at 01.01.2009 in accordance with the JORC code
(3) Comfirmed by Snowden Mining Industry Consultants Inc. in acordance with the JORC Code in July 2009
(4) Estimated by Wardell Armstrong International in accordance with the JORC Code in 2007
(5) Estimated by AMC Consultants in accordance with the JORC Code in 2007
(6) Estimated by Aker Kvaerner in accordance with the JORC Code in 2008
 
(7) Estimated by SRK Consulting (UK) Ltd as at 31.12.2009 in accordance with the JORC code